How can I sync a field that has been added to an existing connection to an issue that is already under sync?
We have an existing connection between Jira DC and Jira Cloud, and we have 950 issues that are already under sync.
We’ve added the ‘Due Date’ field to the connection, and now we want to sync this field for all 950 issues that are already under sync.
I tried to ‘Exalate’ the issue again (while the issue was already under sync), but it didn’t work.
Thanks,
Daniel